Art.-No. 534352

fischer universal end clamp PM U AL 30 - 50 AL black, Aluminium

Top Features
  • Universal use for panels from 30 to 50 mm thickness
  • Quick insertion into the profile
  • Flat and with recessed screw to avoid creating shadows
  • Made of aluminium EN AB 46100

Your advantages / Product description

Universal end clamp for PV panels with aluminium frame from 30 to 50 mm thick
Advantages
  • Full range: the PM U pre-assembled universal clamp can fix all photovoltaic modules with a thickness of 30 mm to 50 mm.
  • Versatile: the PM U pre-assembled universal clamp can be used both as an end clamp and as a central clamp.
  • Fixing: thanks to the smart nut, the PM U pre-assembled universal clamp can be quickly hooked and locked at any point on the support rail.
  • Compact: the recessed screw in the element avoids shadowing on adjacent modules.
  • Convenient: thanks to the spring, the PM U pre-assembled universal clamp remains raised during the tightening phases.
  • Complete: the PM U pre-assembled universal clamp does not require additional elements (for example: screws, gaskets, nuts).
PM U is the universal clamp for PV panels from 30 to 50 mm thickness, which can be used both as central clamp or end clamp. PM U fits quickly inside the profiles by simply rotating it. Compatible with SolarFish H33, SolarFish H44, SolarFish H83, and SolarMetal rails.
Properties
  • Clamp in EN AB 46100 aluminium alloy in accordance with EN 755-2:2013.
  • A2-70 stainless steel Allen screw in accordance with EN ISO 3506-1/2:2009.

Application and approval

Applications
Suitable for:
  • Pitched roof systems with hooks
  • Flat roof systems with triangular frames
  • Trapezoidal metal sheet roof systems
  • Corrugated sheet roof systems
  • Special structures systems
To fix PV modules on rails:
  • SolarFish H33
  • SolarFish H44
  • SolarFish H83
  • SolarMetal
Approval
  • TUV - R 60154136

Assembly instruction

Functionality
  • Insert the lower part of the PM U pre-assembled universal clamp into the upper groove of the rail.
  • Turn the PM U pre-assembled universal clamp clockwise to use it as an end clamp and anticlockwise to use it as a central clamp.
  • Lock the PV module by applying a tightening torque of 10 Nm to the Allen screw (TCEI).
Installation universal clamp PM U usage as end clamp
1 / 5
Installation universal clamp PM C U for central use only
1 / 6
Installation universal clamp PM U usage as central clamp
1 / 6

Technical Data

Module thickness (
dp
)
30 - 50 mm
Weight 120 g
Width across nut (hexagon socket) (
SW
)
6 mm
Screw length (
ls
)
40 mm
Installation torque (
Tinst
)
10 Nm
Amount 10 pcs.
GTIN (EAN-Code) 8001132049181

Documents for Downloading

  • Approvals and Certificates
  • Sales materials
Certificate
pdf, TUV - R 60154136
TUV Certificate
Valid from 01/11/2021
to 01/11/2026
cd-blue-c6785f99-b6bsb