Promoting mobility, tourism and the economy - these are the goals of Istanbul Airport, which will be the largest airport in the world when completed. Numerous fischer FireStop products were used to protect the lives of passengers and airport users as well as the infrastructure in the event of a fire breaking out.

After the first construction phase of Istanbul Airport was successfully completed from 2014 to 2018, the airport already handles around 90 million passengers per year. In five years, two runways, an air traffic control tower and a passenger terminal were built on an area of approximately 1.4 million m². When all construction phases are completed, the passenger capacity is expected to more than double to over 200 million. Six runways on a total construction area of about 76.5 million m² will enable passengers to be transported safely to their destinations.

The client is the joint venture iGA, which was founded for the construction of the airport. The cooperation consists of the companies Kalyon, Cengiz, Mapa and Limak, which are active in Turkey and worldwide in various industries, such as construction, energy, tourism, mining and port and airport management. As an important safety precaution for people, property and infrastructure, Istanbul airport is fully equipped with fischer FireStop passive fire protection solutions, which help to prevent the spread of fire, smoke and toxic gases in case of fire. Safety for use in Turkey is provided by assessments according to European standards, such as the European Technical Assessment (ETA). The installation companies commissioned for the technical building equipment (MNG, EHA, Qubi, 3Gen, Redgon and many more) installed the easy-to-install and highly effective products from the fischer range for passive fire protection in the terminal, tower and all other utility buildings at Istanbul Airport - all of which are constructed using reinforced concrete as a skeleton structure.

Object profile

Building area:
76.5 million m²
Building owner
Joint-Ventura iGA
Future passenger capacity:
200 million passengers per year
Object type:
Airport
The products installed to seal off the penetration openings include the FCPS panel system - a rock wool core coated with the ablative sealant FPC. The FCPS is designed to provide up to four hours of space closure and two hours of temperature resistance. In addition, there were 1-component, water-based acrylic emulsions. These include the fischer FiAM, which provides up to five hours of space closure by allowing the product to form a highly insulating barrier for fire sealing when exposed to fire. Also used was the intumescent 1-component compound FiGM, made of a graphite-based material that foams up under high pressure. Through intumescence, it expands up to 20 times its own volume when exposed to fire and hardens to form an elastic, flexible fire seal.
cd-blue-54ff7c8c74-2pfgf